East Chicago bridge project.

Construction Contractors Discover Winning Solution to Equipment Shortages

04/04/2022

The $1.2 trillion Infrastructure Investment and Jobs Act is the single largest investment in America’s infrastructure in modern history. The far-reaching effort will upgrade roadways, water systems, railroads, mass transportation, ports, airports and utilities. While the federal government’s emphasis on infrastructure is epic, civil construction contractors face a significant challenge: shortages in everything from materials and labor to equipment.

“Given the government’s focus on civil projects, construction contractors need to expand their heavy lifting capabilities,” shared Christopher Cox, P.E., Founder and President of Engineered Rigging. However, that is easier said than done.

A variety of market conditions have driven up prices and created long wait times for new construction equipment.  One root cause is the steel shortage in the US. Reuters reports that  prices and unfilled orders for US steel prices have skyrocketed. Another factor is that access to overseas sources continues to be delayed by supply chain issues.

Savvy contractors have identified an affordable solution: equipment rental. “In 2021, demand doubled for Engineered Rigging’s heavy lifting and specialized transport equipment rental. We expect that surge to continue in 2022 and beyond as cities across America implement their infrastructure projects,” stated Cox (pictured below on the Cline Avenue Bridge in East Chicago).

The company’s innovative heavy lifting equipment has been used in several recent civil construction projects including the Wittpenn Bridge, Panther Island Bridges, Cline Avenue Bridge, construction of a hydropower plant and power plant upgrades.

Wittpenn Bridge construction site.

Reaping the Rewards of Equipment Rental

A primary benefit of renting heavy lifting and specialized transport equipment is affordability. Contractors can safeguard their CAPEX budgets against inflation and free up their budgets for other expenditures.

“The beauty of equipment rental is that you only pay for it when you need it. You don’t have a tens or hundreds of thousands of dollars in equipment sitting idle between projects,” explained Cox.

In addition, civil construction contractors can arrange delivery of the equipment to align with their project schedule and fill any voids in their fleets.

“Time and time again, we receive calls from contractors who have been waiting months for their new equipment to arrive. This may lead them to look at alternative installation and engineered equipment solutions because they simply can’t afford project delays caused by equipment backlogs,” added Cox.

Engineered Rigging has a fleet of heavy lifting and specialized transport equipment available, and we continue to expand based on client demand. The newest addition to our offerings is the JS500 Jack-Up System which has a 2,200 ton lifting capacity up to heights of 50+ feet, making it ideal for  bridge construction, repair and demolition; highway overpass construction; airport elevated walkway installation and port crane lifting. Below is a sampling of Engineered Rigging’s rental equipment. 

Construction Heavy Lifting Rentals

JS500 Jack-Up System

Bridge construction & demolition

Highway overpass construction

Airport elevated walkway installation

Port crane lifting

Strand Jack Systems

Bridge construction & demolition

Falsework removal

Port crane lifting

Railroad bridge span replacement

Cantilever Segmental Bridge Lift (CSBL)

Accelerated Bridge Construction

Rapid Rail Bridge Replacement System

Rail Bridge Repair

Hydraulic Gantries

Subway construction

Power & energy plant maintenance

Civil construction heavy lifting

Power Slide System

Bridge construction

Highway overpass construction

Subway construction

Receive our free newsletter in your inbox.

Popular Topics

During construction of a pharmaceutical plant in North Carolina, eight jack-up systems are shown holding a 245,000 pound pipe rack in position at 22 feet elevation.

Massive Pipe Rack, Multiple Challenges

Top 5 Rigging Stories of the Year

A photograph of the 50-year-old Glebe Road overpass bridge in Bermuda.

3-Inch Clearance: The Custom Lift That Saved a 50-Year-Old Bridge

Blue Origin launch site as seen from above.

Assembling Blue Origin’s New Glenn Rocket

Foxtrot SOLO 20 Motorized Dolly